Work out what you actually need

Measure the bed, pick a depth, and this converts it to cubic yards, what it will weigh on the truck, and roughly what it should cost delivered where you are.

—cubic yards
—approximate weight
—delivered, typical range
—pickup loads if you haul it

Screened topsoil runs roughly 2,000–2,400 lb per cubic yard dry, more after rain. Order about 10% over: soil settles, and a second delivery costs more than the first yard did.

Find suppliers near you

It is the commonest complaint in the trade, and it splits about evenly: half the time the load is fine and looks small, half the time it genuinely is short. The difference is measurable in about two minutes, and you should measure before you call.

Measure the pile first

A tipped load is roughly a cone, and a cone's volume is easy to estimate. The rule:

Cubic yards ≈ width across (feet) × width across × height (feet) ÷ 100

So a pile twelve feet across and five feet high is 12 × 12 × 5 = 720, divided by 100 = about 7 cubic yards. That is within a few percent of the real figure.

A few reference points:

  • 8 ft across, 3 ft high — about 2 yards
  • 10 ft across, 4 ft high — about 4 yards
  • 12 ft across, 5 ft high — about 7 yards
  • 15 ft across, 6 ft high — about 13 yards

Measure the width at the ground, and the height at the peak. If the pile is long rather than round because the driver rolled forward while tipping, measure it as a ridge instead: length × width × height ÷ 2, then divide by 27.

Why a correct load looks small

  • Piles are smaller than people picture. Ten cubic yards is a heap about fifteen feet across and five feet high. Most people expect something the size of a car.
  • It settles as it tips. Material that was loose and aerated in the bed compacts on impact, then slumps over the following hour.
  • Wet soil packs tighter. The same tonnage occupies noticeably less space wet than dry.
  • Heaped versus struck. A truck bed rated at ten yards holds ten struck level and more heaped. If you were quoted on a heaped load and got a struck one, both parties think they are right.

Buying by the ton is where most disputes start

If you ordered by weight, volume tells you less than you think. Topsoil runs roughly 2,000 lb per cubic yard dry and up to 3,000 lb saturated — see what a cubic yard weighs. Ten tons of wet soil is materially less soil than ten tons of dry, and you paid for the water.

This is not usually dishonesty; it is a genuine ambiguity in how the trade sells. It is also the reason to agree the unit when you order, and to prefer cubic yards if you have the choice.

If it really is short

  1. Photograph it before you touch it, with something for scale — a spade standing in the pile works.
  2. Write down your measurements and the figure they give.
  3. Call the same day. Once you have spread half of it, nobody can establish anything.
  4. Ask for the ticket. A load sold by weight should have a weighbridge docket. Sold by volume, ask what the truck is rated at and whether it went out heaped or struck.
  5. Ask for the balance, not a refund. Yards will nearly always send the difference on the next truck heading your way; refunds involve accounts and take longer.

Most established yards settle this without argument, because they would rather send a yard of soil than lose a repeat customer. A yard that will not discuss it, or cannot tell you what the truck was rated at, has told you something useful.

Checking the load before it tips

Measuring the pile is the fallback. If you are there when the truck arrives you can do better, because a truck bed is a box and a box is easy.

Cubic yards in the bed = length × width × average depth of material, in feet, divided by 27.

A bed sixteen feet long and seven and a half feet wide, filled to three feet, holds 16 × 7.5 × 3 = 360 cubic feet, or about thirteen cubic yards. Judge the depth at the middle and allow for the heap above the sides, or take the struck level and treat anything above it as a bonus.

It is also fair to ask the driver what the body is rated at and whether it went out heaped or struck. Drivers know their trucks and almost always answer plainly; it is the yard office that gets defensive.

The other things that go wrong

Quantity is the complaint people expect. These are the ones that matter more and get noticed later.

  • The wrong material. Fill dirt delivered as topsoil is the classic. If it is pale, heavy, full of clay and nothing is growing in it, it may not be what you ordered — fill dirt vs topsoil and what good topsoil looks like cover how to tell.
  • Unscreened when you paid for screened. Roots, stones and clods over about an inch mean it has not been through a screen, whatever the invoice says.
  • Contamination. Glass, plasterboard, concrete fragments or tarmac in the pile. Photograph it and refuse it — this is not a negotiation about quantity.
  • Weed-infested stock. Visible roots of bindweed or couch through the material is a real defect, and it is far cheaper to reject the load than to weed a new lawn for five years.
  • Soaking wet when sold by weight. Not a defect exactly, but it is why the yard looks small, and it is a reason to agree volume rather than weight next time.

What a weighbridge ticket shows

If you bought by weight, the ticket is the evidence and you are entitled to ask for it. It records the gross weight of the loaded truck, the tare weight of the empty one, and the net — which is your material.

Two things to look at. Check the date and time, because a tare recorded days earlier is not evidence about today's load. And check the net against what you ordered, remembering that it includes the water in the soil: ten tons delivered after a wet week is genuinely less soil than ten tons in August, which is an argument about the unit rather than about honesty.

Preventing it next time

  • Agree the unit — cubic yards or tons — and get it on the confirmation.
  • Ask whether the price is heaped or struck.
  • Work out what you need first, with the topsoil calculator, so you know what a correct load should look like.
  • Be there when it tips, if you possibly can.

Frequently asked questions

How do I know if my topsoil delivery was short?

Measure the pile before you touch it. Width across in feet, times width again, times height, divided by 100, gives cubic yards within a few percent. A pile twelve feet across and five high is about seven yards. Photograph it with a spade standing in it for scale, then call.

What does a yard of topsoil look like?

Smaller than people expect — roughly a cone six feet across and a little over two feet high, or about nine wheelbarrow loads. Ten yards is a heap around fifteen feet across and five feet high. Most "short load" calls are really this expectation gap.

Can I get a refund for a short load?

Usually you will be offered the balance rather than money, and that is normally the better outcome — yards will send the difference on the next truck heading your way, where a refund goes through accounts and takes weeks. Ask for the shortfall to be delivered.

How long do I have to complain?

The same day, in practice. Once you have spread half the pile nobody can establish what arrived, and most yards' terms are written accordingly. Measure and photograph before the first barrow load moves.

Is a heaped yard different from a struck yard?

Yes, and it is a common source of honest disagreement. A bed rated at ten yards holds ten struck level with the sides and noticeably more heaped above them. If you were quoted on one basis and delivered on the other, both parties believe they are right. Agree it when you order.

Does topsoil shrink after delivery?

The pile settles rather than the soil disappearing. Material that was loose and aerated in the bed compacts on impact and slumps over the following hour, so a heap measured the next morning reads smaller than the same load measured as it landed. Spread over ground it settles another 15–20%, which is why you order extra.

For a sense of what a large load should look like before it arrives, what ten yards of topsoil looks like has the pile dimensions at every height.